Road works · Paddington
Balmain Terrace, Paddington: Shuttle Flow
Balmain Terrace between Musgrave Road and Plunkett Street, both directions, for construction, daily 7am–4pm.
- Road
- Balmain Terrace
- Closure
- Shuttle Flow
- Direction
- Both Directions
- Hours
- Daily 7am–4pm
- Dates
- Mon 28 Sept to Sat 28 Nov
- Work
- Construction
- Suburb
- Paddington
Source: Planned road closures, Brisbane City Council · CC BY 4.0
More like this
- Road works · 7pm–4am · until Thu 10 Dec
Latrobe Terrace, Paddington: Shuttle Flow
Latrobe Terrace between Morris Street and Collingwood Street, both directions, for construction, overnight 7pm–4am.
- Road works · 6am–4pm · until Thu 31 Dec
Fernberg Road, Paddington: Shuttle Flow
Fernberg Road between Baroona Road and Guthrie Street, both directions, for construction, daily 6am–4pm.
